About

One contractor, start to finish.

Tidal Ridge Contracting is a Wilmington renovation and construction company. The person who walks your project is the person who runs it.

Most renovation problems are not craftsmanship problems. They are coordination problems. A trade that did not show, a decision nobody made, a week that quietly became three and no one told the owner.

We built this business around the opposite of that. One point of contact, a written scope before anything starts, trades sequenced and held to it, and a straight answer the day something changes rather than the week after.

The work itself runs from a single bathroom to a whole-home renovation, a garage conversion, a backyard build or a commercial fit-out. What does not change is the part nobody photographs: the waterproofing, the base under the turf, the protection on the floor while somebody is still living in the house.

If we are not the right fit for a project, we will say so. That is cheaper for everyone than finding out in week six.

Waterproofing membrane rolled over backer board before tile
Based
Wilmington, NC
Covers
Wilmington, Leland, Ogden, Castle Hayne, Rocky Point, Hampstead, Surf City, Wrightsville Beach, Carolina Beach and the greater Cape Fear area
Hours
Always open

The Tidal Ridge Standard

How the job is actually run.

Most renovation complaints are not about craftsmanship. They are about not being told anything. These five are what we commit to on every project, big or small.

Refinished teal kitchen cabinets with white counters, a grey island and stainless appliances
A kitchen refinish, handed back. Doors rehung on a consistent reveal, counters wiped down, floors clean. The walkthrough happens in a finished room, not a jobsite.

Built for coastal living

A house here ages differently.

Humidity, salt load, flat sandy lots and wind-driven rain are design inputs on the coast, not edge cases. Most of what fails early on a Wilmington property fails for one of these six reasons.

New concrete driveway at a large oceanfront house

Moisture and humidity

Wilmington sits at high humidity most of the year. Materials that are fine inland cup, swell and grow mould here. We specify for the actual environment: moisture-resistant substrates in wet areas, acclimated flooring, and ventilation that moves air instead of sealing it in.

Drainage and grading

Flat lots and sandy soil mean water that is not deliberately sent somewhere sits against the building. Slope, downspout runs and base drainage get designed before concrete or turf goes in, because neither can be re-graded afterwards.

Salt air

Salt accelerates corrosion on anything ferrous, which is why a standard fastener fails early this close to the water. Stainless and coated hardware, corrosion-rated fixtures and finishes that tolerate salt load are the default on beach-side work, not an upgrade.

Waterproofing

On the coast, waterproofing is the structure. Showers get a continuous membrane and a pan that actually slopes. Exterior openings get flashed in the right lap order. Decks get the detail at the ledger done properly, because that is where they fail.

Materials that belong here

Composite where wood would rot, marine-grade where water sits, PVC trim where paint would fail in two seasons. Sometimes the right call is the cheaper material, and we will tell you when it is.

Storm season

Wind-driven rain and hurricane season are a design input, not an emergency. Fastening schedules, flashing detail and the way a structure is tied together matter more here than almost anywhere else in the state.

How it goes

Four steps, no surprises.

From the first call to the last punch item, this is the whole process. There is nothing else hiding behind it.

01

Walkthrough

We come look at the actual space. Not a phone estimate, not a number off a photo. We talk through what you want, what the building will allow, and what it will realistically cost.

02

Written scope

You get the scope in writing: what is included, what is not, what materials, what timeline and what price. Nothing vague enough to argue about later.

03

Scheduled build

Trades sequenced, dates committed, site protected. You get updates as it moves and a straight answer the day anything changes.

04

Walkthrough and punch

We walk it together with a list. Everything you flag gets closed out before the final invoice. You decide when it is finished.

Next step

Tell us what you
are thinking about.

Send the project type, your rough timeline and a few photos. We will come look at the space and give you a real number in writing, with no obligation and no charge for the estimate.