Renovations · 2026

Bedroom taken back to the studs

Drywall out, popcorn ceiling gone, everything rebuilt: insulation, trim, flooring, lighting and paint.

Category

Renovations

Timeline

One week, demo to finished

Scope

7 line items

Services

Whole-home & Airbnb, Painting & finish

Demo to finished

The same bedroom finished in deep green with white trim, new windows trimmed out and dark plank flooring
Bedroom stripped to bare studs and insulation with debris on the subfloor
Demo
Finished

Drag the handle, or use the arrow keys

Scope of work

  • Full demo to framing
  • Popcorn ceiling removed
  • Insulation and drywall
  • New trim, casing and baseboard
  • Plank flooring throughout
  • Ceiling fan and electrical
  • Paint, walls and ceiling

01 · The challenge

Everything on the outside wall was open at once. Studs, batt insulation, window returns and a textured ceiling that had to come down before anything else could be closed up. A room in that state has no reference lines left, so every plane has to be re-established rather than matched to what was there.

02 · What we did

Ceiling stripped and re-finished flat, insulation corrected, walls closed and skimmed, then trim run to new lines rather than to the old openings. Flooring, casing and baseboard were sequenced so nothing had to be cut twice.

03 · The result

A finished room with square window returns, a flat ceiling and a continuous floor. The deep green reads well against the white trim because the trim is actually straight.

On site

Bedroom stripped to bare studs
Studs, insulation and a textured ceiling waiting to come down.
Finished bedroom
Flat ceiling, square returns, continuous floor.