01 · The challenge
Refinishing in place means the room is still a room. Floors, counters, appliances and an open plan living space all had to be protected from overspray, and the client kept using the kitchen while the doors were out being sprayed.

Renovations · 2026
The existing kitchen kept and resprayed rather than replaced. Same boxes, same layout, completely different room.
Category
Renovations
Timeline
Five days, kitchen usable throughout
Scope
5 line items
Services
Painting & finish
Doors off to finished


Drag the handle, or use the arrow keys
Scope of work
01 · The challenge
Refinishing in place means the room is still a room. Floors, counters, appliances and an open plan living space all had to be protected from overspray, and the client kept using the kitchen while the doors were out being sprayed.
02 · What we did
Doors and fronts came off and were numbered so every one went back to the opening it was hung in. Boxes were masked, degreased, sanded and primed in place. Finish coats were sprayed rather than brushed, which is the entire difference between a refinish and a repaint.
03 · The result
A factory-grade finish on the cabinets that were already there, at a fraction of replacement, with the hardware reset so the doors sit on a consistent reveal.
On site



Services used
Interior Painting & Finish Work
Before / afterBathrooms & tile · 2025
A builder-grade tub alcove taken back to the studs, waterproofed as a system, and rebuilt as a full-height tiled shower.
Before / afterRenovations · 2026
Drywall out, popcorn ceiling gone, everything rebuilt: insulation, trim, flooring, lighting and paint.
Before / afterOutdoor living · 2026
A bare, rutted side yard graded, based, bordered and laid in turf. Poolside, and flat enough to putt on.